Fastvue Sophos Reporter 2.0 Beta Now Available
New Features in Fastvue Sophos Reporter 2.0 include more useful Web Browsing Activity reports, Private Report Sharing, Export to CSV and more!
I'm excited to announce that Fastvue Sophos Reporter 2.0 Beta is now available to test out!
New Features in Fastvue Sophos Reporter 2.0
- Fastvue Site Clean (works best with Sophos UTM 9.3).
- Private Report Sharing (including Scheduled Private Reports).
- Activity Report Gantt Bars
- Export to CSV for all reports and report tables
- Search Terms in User Overview Reports
- Support for new log field in UTM 9.3 (Referrer URL, User Agent & AD Domain)
- Filter Reports and Alerts by UTM (Firewall Server IP, or Firewall Name)
- Updated Alerts Interface
- Memory usage improvements & many other bug fixes and minor improvements.
Fastvue Site Clean
Fastvue Site Clean is definitely the biggest and most exciting new feature for the 2.0 release, and for web reporting in general. It is is the 'secret sauce' Fastvue has been working on for a long time now.
Reporting on web activity using log data from your firewall or proxy has become an almost impossible task due to the way modern websites are architected.
A typical website consists of advertising banners, site analytic scripts and social sharing widgets, and the site's content itself is served from content delivery networks (CDNs). Although you're simply reading an online news article, behind the scenes, your browser is visiting dozens of weird and wonderful sites such as akamaihd.net, doubleclick.net, google-analytics.com, and even facebook.com thanks to that handy 'Like' button on the page.
All these domains end up in your proxy or firewall's log files, and dominate your web activity reports. Until now...

Fastvue Site Clean takes into account other characteristics of web browsing data including referrer URL (new in UTM 9.3), MimeTypes and categories, along with a frequently updated web service, to provide a more accurate picture of web browsing activity.
We're very excited to bring this feature to you, and we hope your web reports start making a lot more sense from now on!
For more information, take a look at our dedicated page on Fastvue Site Clean (work in progress).
Private Report Sharing
One of the most popular feature requests for Fastvue Sophos Reporter 1.0 since it was released last year is the ability to securely share a report with someone, without them being able to access other reports or features of the application.

In Fastvue Sophos Reporter 2.0, whenever you schedule, share or email a report, you have the option to do it 'privately'. When someone receives a link to a private report, they see only the report, not the full application such as the Settings tab and so on.
Private Reports are served from the /p folder in the website, which can be made available to all or specific users, while the rest of the site is locked down to administrators using IIS (see our article on securing Sophos Reporter)
The 'Private' option is presented when sharing and emailing reports, as well as when Scheduling Reports. To get started, click the Share button when viewing a report, or edit your existing Scheduled Reports (Settings | Reports | Scheduled Reports) and turn on the 'Private' option.
Activity Report Gantt Bars
Inline with our commitment to make web reports more meaningful, we are introducing new embedded Gantt bars within Activity Reports. These green bars provide a useful visualization of when and how long websites were visited.

You can easily identify which sites were browsed the longest and then click on the rows in Activity Reports to view full URLs, timestamps and categories.
Activity Reports utilize the new Fastvue Site Clean feature so all the 'junk' domains will be rolled into the 'actual' site someone was looking at.

Other features
We hope you enjoy the many other features and fixes that come with this release, including Export to CSV throughout the application, Search Terms in User Overview reports and more.
Download
Click here to download Fastvue Sophos Reporter 2.0 Beta
Installation
As this is a beta, you may like to install it separately on another machine or VM while testing. Be sure to add the new machine as a Syslog Server in Sophos UTM (Web Admin | Logging and Reporting | Log Settings | Remote Syslog).
If you want to upgrade your existing installation to the beta, we recommend backing up your existing settings and data first. This is as simple as making a full copy of the contents of Sophos Reporter's data location, shown in Settings | Data Storage | Settings (default is C:\\ProgramData\\Fastvue\\Sophos Reporter).
More detailed installation and upgrade instructions are presented after downloading the software above.
Feedback
This is a beta, so please report any issues or questions via our Support Portal. We look forward to hearing from you!
2 Comments
Archived from our previous comment system.
- Philip
Very cool report tool. Hope this will help administrator get more useful report from UTM.
I will test it and introduce it in my site.- Scott Glew
Thanks Philip! We hope you like it :)
Cheers!
Scott